Pages
Creative Woodworking
Saturday, October 6, 2012
Monday, October 1, 2012
InStyleTour 2012 / 1st Stop Boston
and
Woot!
It's almost time to meet up for the 1st InStyleTour Event in Boston's North End.
Dinner @ Villa Francesca
"Welcome to the finest Italian seafood in the North End"
Todd Vendituoli and Andie Day have compiled a wonderful group, which Richard Preston (from Vermont Custom Cabinetry) and I (Sandy @VTWorks, @sandyconnolly) are thrilled to be a part of.
Boston / Art / Design / Dinner / Designers / Bloggers
Just a few shout outs...
Looking forward to meeting everyone!
Tuesday, July 31, 2012
Front Deck - July Progress
The door to nowhere, gets a deck....July Progress!
Post hole digging, not fun and it was super hot.
Girls always add to the fun.
Shoulder height, perfect.
Time for concrete.
Footing 1 done, 3 more are needed for the main deck.
How many bags of concrete so far? Nevermind.
Footings 1, 2, 3, 4.
Filling in, luckily we had a nice pile of fill waiting for this area.
Off comes the sliding.
Drip edge attached, ready for flashing.
Flashing on, bring on the ledger.
Ledgers are designed with off set blocking, this will keep the water off the house.
Level? I hope?
Tighten up.
Rock surfing is always appropriate!
Transit time.
Ledgers need to be in line.
Ledgers 1, 2 and
Three.
Step down in this area, thank you water spickett...not.
Posts & plates, now your talking.
The step down in our siding has always looked strange, not sure how to deal with that, as it will still show at stairs...ideas anyone?
More posts and plates.
Joists
and more joists.
Labels:
deck addition
Windsor, VT, USA
Windsor, VT 05089, USA
Saturday, June 30, 2012
Subscribe to:
Posts (Atom)















